Arrange the steps of controlling process in their correct order or sequence.
A. Setting performance Standards
B. Measurement of actual performance
C. Analysing deviations
D. Taking corrective action
E. Comparison of actual performance with standards
Choose the correct answer from the options given below.
Answer & explanation
Correct answer: option 2
The correct answer is Option (2) → A, B, E, C, D
Step 1 — A. Setting performance standards: the targets are fixed first. They are the yardstick against which work will be measured.
Step 2 — B. Measurement of actual performance: the work actually done is measured, for example by reports or by counting output.
Step 3 — E. Comparison of actual performance with standards: the actual result is put next to the target. This shows the deviation (gap).
Step 4 — C. Analysing deviations: the causes of the gap are found, and the important deviations are picked out.
Step 5 — D. Taking corrective action: steps are taken to remove the causes, so that the targets can be met.
NCERT (2026-27 Edition): “Controlling Process Controlling is a systematic process involving the following steps.” “Step 1: Setting Performance Standards: … The first step in the controlling process is setting up of performance standards. …” “Step 2: Measurement of Actual Performance: Once performance standards are set, the next step is measurement of actual performance. …” “Step 3: Comparing Actual Performance with Standards: … This step involves comparison of actual performance with the standard. Such comparison will reveal the deviation between actual and desired results. …” “Step 4: Analysing Deviations: … After identifying the deviations that demand managerial attention, these deviations need to be analysed for their causes. …” “Step 5: Taking Corrective Action: The final step in the controlling process is taking corrective action. …” |