A alone can do a piece of work in 12 days. B alone can do the same work in 18 days. C alone can do the same work in 24 days. In how many days will they complete 65% of the work, if all three work together? |
3.6 days 3.9 days 4.2 days 4.5 days |
3.6 days |
A = 12 days, B = 18 days, C = 24 days, ⇒ 65% of total work = \(\frac{65}{100}\) x 72 = 46.8 units, ⇒ Time required for A + B + C to complete 65% of the work = \(\frac{46.8}{6+4+3}\) = \(\frac{46.8}{13}\) = 3.6 days, ..(\(\frac{Work}{Efficiency}\) = Time) |