A company uses two groups of inspectors. An inspector of group A checks 30 pieces per hour with 96% accuracy and is paid Rs. 50 per hour. An inspector of group B checks 20 pieces per hour with 95% accuracy and is paid Rs. 40 per hour. Each error made in checking costs the company Rs. 10. If group A inspectors work for x hours and group B inspectors work for y hours in all, then the objective function for minimising the total inspection cost (in Rs.) is
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → \(Z = 62x + 50y\)
The cost of one hour of an inspector is the wage plus the cost of the errors made in that hour.
A group A inspector checks 30 pieces an hour and is wrong on \(100\% - 96\% = 4\%\) of them:
Errors per hour \(= 0.04 \times 30 = 1.2\)
Hourly cost \(= 50 + 10 \times 1.2 = 62\)
A group B inspector checks 20 pieces an hour and is wrong on \(100\% - 95\% = 5\%\) of them:
Errors per hour \(= 0.05 \times 20 = 1\)
Hourly cost \(= 40 + 10 \times 1 = 50\)
So the total cost to be minimised is
\(Z = 62x + 50y\)
Why the other options are incorrect
Option (1) \(Z = 50x + 40y\) — Incorrect. This counts only the wages and leaves out the cost of errors.
Option (2) \(Z = 338x + 230y\) — Incorrect. This charges Rs. 10 for every correct check (96% and 95%) instead of every error (4% and 5%).
Option (4) \(Z = 50.4x + 40.5y\) — Incorrect. This forgets that 30 and 20 pieces are checked in an hour, so the errors per hour are too small.