Study the diagram given below and answer the question.

What is the total variable cost of the firm at output q1?
Answer & explanation
Correct answer: option 2
The correct answer is Option (2) → The area of rectangle OEBq1
Total variable cost = AVC × quantity. At q1, AVC is the height OE and quantity is the width Oq1. Their product is the area of rectangle OEBq1.
Option (1) The area of rectangle OpAq1 — Incorrect. This is price × quantity, the total revenue at q1.
Option (2) The area of rectangle OEBq1 — Correct. Height OE times width Oq1.
Option (3) The area of rectangle OEBq1 + TFC — Incorrect. Adding TFC to TVC gives total cost.
Option (4) The area of rectangle pEBA — Incorrect. This is the amount by which TVC exceeds TR at q1.
NCERT (2026-27): “Case 1: Price must be greater than or equal to AVC in the short run … Let us turn to Figure 4.4. Observe that at the output level q1, the market price p is lower than the AVC. We claim that q1 cannot be a profit-maximising output level. … Notice that the firm’s total revenue at q1 is as follows
|
