Which of the following is a prerequisite for controlling?
Answer & explanation
Correct answer: option 1
The correct answer is Option (1) → Planning
| Option | Reason |
|---|---|
| Option (1) Planning. Correct. | Planning provides the goals or standards against which actual performance is measured, so without it controlling cannot find deviations; planning is therefore a prerequisite for controlling. |
| Option (2) Coordination. Incorrect. | Coordination does not set the goals or standards that controlling measures performance against, so it is not a prerequisite for controlling. |
| Option (3) Organising. Incorrect. | Organising is performed within the framework of the plans drawn, so it follows planning and gives no standards for controlling to measure against. |
| Option (4) Directing. Incorrect. | Directing is also performed within the framework of the plans drawn, so it gives no standards for controlling to measure against. |
NCERT Extract (2026-27 Edition): Correct option (1) (vi) Planning establishes standards for controlling: “Planning provides the goals or standards against which actual performance is measured.” “Therefore, we can say that planning is a prerequisite for controlling. If there were no goals and standards, then finding deviations which are a part of controlling would not be possible.” Wrong options (2), (3) and (4) (ii) Planning is a primary function of management: “All other managerial functions are performed within the framework of the plans drawn. Thus, planning precedes other functions.” |