A and B working together can do 30% of the work in 6 days. B alone can do the same work in 25 days. How long will A alone take to complete the same work? |
75 days 60 days 80 days 100 days |
100 days |
A + B = 30% Of W = 6 days = 20 days, B = 25 days, ⇒ A + B = 5, (Efficiency) ⇒ A + 4 = 5, ⇒ A = 1, ⇒ Time required by A to complete the total work alone = \(\frac{100}{1}\) = 100 days, ..(\(\frac{Work}{Efficiency}\) = Time) |