One of the technique of scientific management differentiates between efficient and inefficient workers. It advocates that efficient workers should be paid higher wages than inefficient workers.
Identify the technique.
Answer & explanation
Correct answer: option 1
The correct answer is Option (1) → Differential Piece Wage System
Option (1) Differential Piece Wage System — Correct. Taylor wanted to differentiate between efficient and inefficient workers. A standard output is fixed first. Workers who reach or cross the standard get a higher rate per piece. Workers below the standard get a lower rate. This rewards efficient workers and pushes others to improve.
Option (2) Fatigue Study — Incorrect. Fatigue study decides how long and how often workers should rest during a task. It does not deal with wages.
Option (3) Method Study — Incorrect. Method study finds the one best way of doing a job, to cut cost and raise quality.
Option (4) Time Study — Incorrect. Time study fixes the standard time needed for a well-defined job. Its result is used to set the standard, but it does not pay workers at different rates.
NCERT (2026-27 Edition): “Differential Piece Wage System Taylor was a strong advocate of piece wage system. He wanted to differentiate between efficient and inefficient workers. …” “…He wanted to reward efficient workers. So he introduced different rate of wage payment for those who performed above standard and for those who performed below standard. …” “Fatigue Study … Fatigue study seeks to determine the amount and frequency of rest intervals in completing a task. …” “Time Study It determines the standard time taken to perform a well-defined job. …” “Method Study The objective of method study is to find out one best way of doing the job. …” |