Which of the following works under planning incharge in functional foremanship technique of scientific management?
A) Speed Boss
B) Time and cost clerk
C) Gang boss
D) Instruction card clerk
E) Inspector
F) Repair boss
G) Route clerk
H) Disciplinarian
Choose the correct answer from the options given below.
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → BDGH
A) Speed Boss — Incorrect. Works under the production incharge. Ensures timely and accurate completion of the job.
B) Time and cost clerk — Correct. Works under the planning incharge. Prepares the time and cost sheet.
C) Gang boss — Incorrect. Works under the production incharge. Keeps machines and tools ready for the workers.
D) Instruction card clerk — Correct. Works under the planning incharge. Drafts instructions for the workers.
E) Inspector — Incorrect. Works under the production incharge. Checks the quality of work.
F) Repair boss — Incorrect. Works under the production incharge. Keeps machines and tools in proper working condition.
G) Route clerk — Correct. Works under the planning incharge. Specifies the route of production.
H) Disciplinarian — Correct. Works under the planning incharge. Ensures discipline.
Tip: The planning side has the three clerks and the disciplinarian; the production side has the three bosses and the inspector.
NCERT (2026-27 Edition): “Functional Foremanship … Taylor advocated separation of planning and execution functions. This concept was extended to the lowest level of the shop floor. It was known as functional foremanship. Under the factory manager there was a planning incharge and a production incharge. Under planning incharge four personnel namely instruction card clerk, route clerk, time and cost clerk and a disciplinarian worked. These four personnel would draft instructions for the workers, specify the route of production, prepare time and cost sheet and ensure discipline respectively. Under Production incharge, personnel who would work were speed boss, gang boss, repair boss, and inspector. These respectively were responsible for timely and accurate completion of job, keeping machines and tools etc., ready for operation by workers, ensure proper working condition of machines and tools and check the quality of work. …” |