Following are the steps related to preparation of charts, arrange them in a correct sequence. (A) Save a chart. (B) Create a basic chart using the pattern from the panel available on top of the worksheet in Chart groups' option. (C) Change the layout or style of chart (D) Enter data on a worksheet with proper column and row titles. Choose the correct answer from the options given below: |
(C), (B), (D), (A) (A), (C), (B), (D) (B), (A), (D), (C) (D), (B), (C), (A) |
(D), (B), (C), (A) |
The correct answer is option 4- (D), (B), (C), (A). (D) Enter data on a worksheet with proper column and row titles. (B) Create a basic chart using the pattern from the panel available on top of the worksheet in Chart groups' option. (C) Change the layout or style of chart (A) Save a chart.
Following are the steps prepare a chart: Step – 1: Enter data in a worksheet with proper column and row titles. (D) Step – 2: Create a basic chart using the pattern from the panel available on top of worksheet in Chart groups’ option. (B) Step – 3: Change the layout or style of chart. (C) Step – 4: Add or remove titles or data labels. Step – 5: Show or hide a legend. Step – 6: Display or hide chart axes or gridlines. Step – 7: Move (resize) a chart Step – 8: Save a chart. (A) |