Match List-I with List-II, where List-II gives the time in hours.
| List-I | List-II |
| (A) A pipe fills a tank in 10 hours, but because of a leak it takes 15 hours; the time taken by the leak alone to empty the full tank | (I) 15 |
| (B) 6 identical pipes fill a tank in 10 hours; the time taken by 4 such pipes | (II) 5 |
| (C) Pipe A is twice as fast as pipe B, and together they fill a tank in 6 hours; the time taken by B alone | (III) 30 |
| (D) A pipe fills an empty tank in 8 hours; the time it takes to fill the tank when the tank is already \(\displaystyle\frac{3}{8}\) full | (IV) 18 |
Choose the correct answer from the options given below:
Answer & explanation
Correct answer: option 2
The correct answer is Option (2) → (A)-(III), (B)-(I), (C)-(IV), (D)-(II)
In each case the work is measured as the part of the tank filled in 1 hour.
(A) A pipe of 10 hours that takes 15 hours because of a leak
This matches (III) 30. The leak takes away the difference of the two rates.
\(\displaystyle \frac{1}{10} - \frac{1}{15} = \frac{3 - 2}{30} = \frac{1}{30}\)
(B) 4 pipes in place of 6 identical pipes
This matches (I) 15. The work needed is \(6 \times 10 = 60\) pipe-hours.
\(60 \div 4 = 15\)
(C) Pipe A twice as fast as pipe B, together 6 hours
This matches (IV) 18. If B fills \(x\) of the tank per hour, A fills \(2x\) per hour.
\(\displaystyle x + 2x = \frac{1}{6}\)
\(\displaystyle x = \frac{1}{18}\)
(D) A pipe of 8 hours with the tank already \(\frac{3}{8}\) full
This matches (II) 5. Only \(\frac{5}{8}\) of the tank remains to be filled.
\(\displaystyle 8 \times \frac{5}{8} = 5\)