When the deviations between the actual performance and the planned performance are within the limits, which of the following course of action is suggested? |
A limited corrective action is required No corrective action is required A major corrective action is required None of the above |
No corrective action is required |
The correct answer is option 2- No corrective action is required. No corrective action is required if the actual performance and the planned performance are within the limits.
|