The correct answer is option 1- Draft instructions for the workers.
- Specify the route of production- ROUTE CLERK
- Prepare time and cost sheet- TIME & COST CLERK
- Ensure discipline- DISCIPLINARIAN
Functional Formanship - Taylor advocated separation of planning and execution functions. This concept was extended to the lowest level of the shop floor. It was known as functional foremanship. Under the factory manager there was a planning incharge and a production incharge. Under planning incharge four personnel namely instruction card clerk, route clerk, time and cost clerk and a disciplinarian worked. These four personnel would draft instructions for the workers, specify the route of production, prepare time and cost sheet and ensure discipline respectively.
|