A and B can do a work in 10 days and 20 days respectively. They started the work together but A left the work 2 days before the completion of the work. In how many days was the work completed? |
4 6 8 7 |
8 |
A left the work before 2 days of completion of work. A's 2 days work = 2 × 2 = 4 unit Let us consider , Total work = 20 = 4 = 24 unit Time taken by both A and B to complete the work = \(\frac{24}{ 2 + 1 }\) = \(\frac{24}{ 3 }\) = 8 days The correct answer is Option (3) → 8 |