Match List-I and List-II
| List-I | List-II |
| (A) Time study | (I) Amount and frequency of rest intervals to complete a task |
| (B) Motion study | (II) Different wage rate for efficient and inefficient workers |
| (C) Fatigue study | (III) Study of various movements |
| (D) Differential piece wage system | (IV) Determining standard time taken for performing a well defined |
Choose the correct answer from the options given below :
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → (A)-(IV), (B)-(III), (C)-(I), (D)-(II)
(A) Time study – (IV) Determining standard time taken for performing a well defined job — Time study determines the standard time taken to perform a well-defined job.
(B) Motion study – (III) Study of various movements — It studies movements like lifting, putting objects and sitting, done while working.
(C) Fatigue study – (I) Amount and frequency of rest intervals to complete a task — Fatigue study seeks to find the rest intervals needed to complete a task.
(D) Differential piece wage system – (II) Different wage rate for efficient and inefficient workers — Efficient workers get a higher rate per unit.
NCERT (2026-27 Edition): “Time Study It determines the standard time taken to perform a well-defined job. Time measuring devices are used for each element of task. The standard time is fixed for the whole of the task by taking several readings. …” “Motion Study Motion study refers to the study of movements like lifting, putting objects, sitting and changing positions, etc., which are undertaken while doing a typical job. Unnecessary movements are sought to be eliminated so that it takes less time to complete the job efficiently. …” “Fatigue Study A person is bound to feel tired physically and mentally if she/he does not rest while working. The rest intervals will help one to regain stamina and work again with the same capacity. This will result in increased productivity. Fatigue study seeks to determine the amount and frequency of rest intervals in completing a task. …” “Differential Piece Wage System Taylor was a strong advocate of piece wage system. He wanted to differentiate between efficient and inefficient workers. The standard time and other parameters should be determined on the basis of the work-study discussed above. The workers can then be classified as efficient or inefficient on the basis of these standards. He wanted to reward efficient workers. So he introduced different rate of wage payment for those who performed above standard and for those who performed below standard. …” |