Arrange the following steps of controlling process in a correct sequence:
(A) Comparison of actual performance with standards
(B) Setting standards
(C) Analysis of deviations and taking corrective action
(D) Measuring actual performance
Choose the correct answer from the options given below:
Answer & explanation
Correct answer: option 2
The correct answer is Option (2) → (B), (D), (A), (C)
(B) Setting standards — first. Targets are fixed, against which the work will be judged.
(D) Measuring actual performance — second. The work actually done is measured.
(A) Comparison of actual performance with standards — third. The measured work is compared with the standards to find the gap (deviation).
(C) Analysis of deviations and taking corrective action — last. The causes of the gap are studied, and steps are taken to correct it.
NCERT (2026-27 Edition): “Controlling Process Controlling is a systematic process involving the following steps. |