Study the graph given below, which shows the short run cost curves of a firm, and answer the questions that follow.

In the graph, the area under the SMC curve up to the output q1 gives:
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → the total variable cost at q1
SMC is the extra cost of each extra unit. Adding up these extra costs from the first unit to q1 gives the total variable cost of producing q1 units. On the graph, this sum is the area under the SMC curve up to q1.
Option (1) the total fixed cost — Incorrect. Fixed cost does not change with output, so it never enters marginal cost.
Option (2) the total cost at q1 — Incorrect. Total cost is TVC plus TFC. The area under SMC leaves out the fixed cost.
Option (3) the total variable cost at q1 — Correct. The sum of the marginal costs of all units up to q1 is TVC at q1.
Option (4) the average variable cost at q1 — Incorrect. AVC is a cost per unit. It is read as the height of the AVC curve at q1.
NCERT (2026-27): “Shapes of the Short Run Cost Curves … Let us now look at the SMC curve. Marginal cost is the additional cost that a firm incurs to produce one extra unit of output. According to the law of variable proportions, initially, the marginal product of a factor increases as employment increases, and then after a certain point, it decreases. This means initially to produce every extra unit of output, the requirement of the factor becomes less and less, and then after a certain point, it becomes greater and greater. As a result, with the factor price given, initially the SMC falls, and then after a certain point, it rises. SMC curve is, therefore, ‘U’-shaped. At zero level of output, SMC is undefined. The TVC at a particular level of output is given by the area under the SMC curve up to that level.” |