The criteria against which actual performance is measured in the process of controlling are called:
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → Standards
Option (1) Grades — Incorrect. Grades are groups of products made on the basis of quality or size. They are a marketing term.
Option (2) Classes — Incorrect. This is not a term used in the controlling process.
Option (3) Standards — Correct. The first step of controlling is setting performance standards. Standards are the criteria against which actual performance would be measured. They act as benchmarks (targets) for the organisation.
Option (4) Appraisals — Incorrect. An appraisal is the act of judging an employee’s performance. It is not the measure itself.
NCERT (2026-27 Edition): “Step 1: Setting Performance Standards: … The first step in the controlling process is setting up of performance standards. Standards are the criteria against which actual performance would be measured. Thus, standards serve as benchmarks towards which an organisation strives to work.” |