Match List-I with List-II.
|
List-I (Foreman as per |
List-II (Functions of Foreman) |
| (A) Speed Boss | (I) Keeping machines and tools ready for operation |
| (B) Route Clerk | (II) Ensure proper working conditions of machines and tools |
| (C) Gang Boss | (III) Timely and accurate completion of job |
| (D) Repair Boss | (IV) Specify the path of production |
Choose the correct answer from the options given below.
Answer & explanation
Correct answer: option 3
The correct answer is Option (3) → (A)-(III), (B)-(IV), (C)-(I), (D)-(II)
(A) Speed Boss — This matches (III) Timely and accurate completion of job. He sees that the job is finished on time and correctly.
(B) Route Clerk — This matches (IV) Specify the path of production. He is under the planning in-charge and specifies the route of production.
(C) Gang Boss — This matches (I) Keeping machines and tools ready for operation. He keeps machines and tools ready for the workers to use.
(D) Repair Boss — This matches (II) Ensure proper working conditions of machines and tools. He sees that the machines and tools are in good working condition.
NCERT (2026-27 Edition): “Functional Foremanship … Under planning incharge four personnel namely instruction card clerk, route clerk, time and cost clerk and a disciplinarian worked. These four personnel would draft instructions for the workers, specify the route of production, prepare time and cost sheet and ensure discipline respectively.” “Under Production incharge, personnel who would work were speed boss, gang boss, repair boss, and inspector. These respectively were responsible for timely and accurate completion of job, keeping machines and tools etc., ready for operation by workers, ensure proper working condition of machines and tools and check the quality of work.” |