N1 alone can do 20% of a piece of work in 6 days, N2 alone can do 20% of the same work in 4 days, and N3 alone can do 50% of the same work in 12 days. In how many days can they complete the work, if all of them work together ? |
10 days $\frac{120}{13}$ days 8 days $\frac{120}{17}$ days |
8 days |
N1 = \(\frac{1}{5}\)W = 6 days = 30 days, N2 = \(\frac{1}{5}\)W = 4 days = 20 days, N3 = \(\frac{1}{2}\)W = 12 days = 24 days, ⇒ Time required by N1 + N2 + N3 to comlete the work = \(\frac{120}{4+6+5}\) = \(\frac{120}{15}\) = 8 days, ..(\(\frac{Work}{Efficiency}\) = Time) |